On 26/o5/09 Paul Wood and I set out to take the twist out of the track between Bangor Road LC and Moles Hill bottom end point this involved cutting foot long sections of 2x1 then drilling through the steel sleepers every so often and screwing the sleepers to them. We do this because the steel strip sleepers have proven to be too thin to pack. We finished installing sleepers along the whole cutting by the end of the day but had no time to begin packing it this will take place in the near future. Once this has been completed we aim to dig out the old ballast on the road side on the balloon loop, fit batons to the track there then relay it with new ballast, we aim for this to take place June/July in preparation for the main 2009 running day to take place in August, which should also include the operation of a new electric loco addition to the fleet, with drawings on show of the future bodywork.

So with the main 2009 running day on the horizon (and I have some very exciting locos in mind, hopefully something which'll excite every Penrhyn Railway enthusiast) you may be interested in attending? Well the easiest way to attend is to give us a day or so of your time to help reballast the section of the balloon loop, the more there is of us the quicker we can get it done, and perhaps even have people on other jobs such as Moles Hill points which with a little machineing could be getting close to being linked up with the lever frame. So e-mail me on williamchigh(at)gmail.com replace the (at) with an @, to register interest.

No comments: