Monday, 27 April 2009

Easter Running Day

Paul Wood reports:
Well, where to start? What a busy day 18/04/09 was. I was the first to arrive at Bethesda, the sun was shining and everything was quiet, but not for long. It soon became 11am and we had to start getting ready. I went up to the tunnel above Moles Hill with Meg to get the empty coaching stock. Once back at Stokerton, we briefed all the drivers on how to use my walkie talkies and Harry’s temporary signalling scheme, very similar to that of the F&WHRs. I can report that the signalling worked very well, but the walkie talkies could be a tad annoying at times. It was hoped that two steamers would visit the line, however only arrived and it was soon discovered that the Tich’s springs hung too low and caught on the check rails, meaning it couldn’t run. So with no steam we turned to the petrol, finally after many days of trying Dave Mills’ Welsh Pony burst in to life, it attempted a couple of laps but as it was the first proper run some bits vibrated loose but following some tweaking it completed its first true lap of the line, a loco designed and built for the railway about 10years ago finally doing the job. And doing that job incredibly well what a sight, smell and sound (something for the senses!), riding behind it was incredible but being allowed to drive it was even better. You could hear it working hard on the gradients near Highfield from Stokerton. With the reliability of Welsh pony much improved, we started a two train service with Meg on the other set. Trains crossed at Moles Hill for the first time in preservation so there was plenty of action. I think I can speak for everyone when I say it was a very enjoyable day. Thanks to everyone involved, sadly though as we were so busy not many photos were taken, but check back soon as I may have some.

No comments: